Skylon Park, Hereford

 1506 Skylon

Specification

Skylon Park, Hereford is a Business Park that is designed to inspire and enable future
business growth and success.

Roofing
Protan 1.6 SE Single Ply Membrane was mechanically fixed to a TATA D35 0.7mm Steel
Deck. The Roof Construction also included PIR Insulation to acheive the required 0.13
U Value together with a Vapour Control Layer to ensure a Condensation Free Environment.

Wall Cladding
The Wall Cladding Specification was a complete Architectural Profiles System. This
included a Half Round Profile HLS200 Ultra 0.7mm External Sheet, the External Sheet
was supported by Architectural Profiles Bar & Bracket Spacer Support System fixed
back to the buildings Sheeting Rails.
The Construction also included a 19mm Architectural Profiles Liner Sheet, Vapour Control
Layer & Thermal Insulation to acheive the 0.15 U Value required.
Where required the Thermal Insulation was replaced with High Performance Fire Retardant
Insulation to provide Fire Protection for up to 120 minutes.

Main contractor

HCT Contracts:
Topaz Business Park
Topaz Way
Bromsgrove
B61 0GD

Architect 

Howl Associates Ltd
Shrubbery House
21 Birmingham Road
Kidderminster
DY10 2BX